This project was challenging in that we were forced to re-engineer the floor joists because we would be adding so much weight above a basement. A gas supply line was run up from the basement ceiling and electricity was run from the adjacent wall. An antique mantel out of Montana was lightly stained and installed. The natural stone was adhered to the pre-framed fireplace walls. Two custom made built in’s using antique barn wood were also installed on each side of the fireplace as well.