City of Fort Collins Drake Water Treatment Plant

Project Location: Fort Collins, Colorado

Date Completed: 8/16/2020

  • Service department building flat roof
  • Removed 51 sqs of 5” gravel ballast roofing and disposed in a jobsite receptacle
  • Lacerated 10’ x 10’ squares in the existing EPDM roof membrane.
  • Installed 5.2” of ISO board insulation
  • Installed .5” of Dens Deck cover board
  • Mechanically attached 51 sqs of Mule Hide 60 mil TPO membrane

Start Your Project with Tom Sawyer Roofing & Construction